CRITICAL MASS BIKE RIDE – JULY 2009

Traffic Jam
Critical jam

The new Burrard Bridge bike lane has been generating  a lot of buzz — for and against it — since its trial period of at least 3 months started this past July 13th.   According to the media, tension between drivers and cyclists has been escalating since then. As a result, this particular Critical Mass bike ride attracted more attention than usual (there is a Critical Mass bike ride every last Friday of each month, starting around 6PM from the Vancouver Art Gallery in Downtown Vancouver).

Burrard Bridge Passing
Critical crossing

I didn’t join the group of CM’ers for this ride, but I caught them as they were crossing Burrard Bridge — as did a couple of media vans parked on the North side of the bridge. Last year, stopping on bridges seemed to be a common occurence, but thankfully, this was not the case yesterday (I can’t say how the other bridge crossings went, though).

Riding the Rythm
Critical fun

As was the case last year, the originality some of the cyclists showed was fun to watch. But as was the case last year also, drivers going in the opposite direction had a much easier time honking and cheering the CM’ers than the ones trailing behind, bumper to bumper.

Critical Leftovers
Critical leftovers

For the short portion I saw, I thought this “edition” of the Critical Mass bike ride was quite civilized and respectful.  With all the unpredictability that comes with it, let’s see how next month’s ride goes…

Advertisements

2 thoughts on “CRITICAL MASS BIKE RIDE – JULY 2009

  1. Pingback: Sunday Links | Outdoor Vancouver

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s